From:                              route@monster.com

Sent:                               Saturday, April 16, 2016 2:04 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: NSN Construction Manager

 

This resume has been forwarded to you at the request of Monster User xapeix03

Harom Pringle 

Last updated:  05/11/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Grand Prairie, TX  75050
US

Mobile: 214-457-6106   
pring48@gmail.com

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: HP_Resume 4-15 Updated (2).docx

Resume Value: x4mt8zchxninvsmp   

  

 


Phone: 929-220-6462 ¨ Email: Pring48@gmail.com

 

technical Professional Experience

 

Tangent, T-Mobile                                                                                 Irving, TX                            Aug 2014 – Oct 2014

Field Engineer

 

¨         Installed, commissioned, integrated, System verification & acceptance for Nokia BTS/TD-LTE (Flexi platform) Network Element - Fiber- optic cable routing and termination, 3G & LTE system synchronizing.

¨         Develop and maintain BTS/TD-LTE project competence, process, and documents for deployment.

¨         Performed advance troubleshooting, followed NSN NED documentation and independently resolve project issues.

¨         Antenna Line configuration and connectivity as well as Flexi BTS/TD-LTE feature set (Rx diversity / Antenna Line sharing)

¨         Coordinated actions and investigated technical Issues between Customer, regional management, tier2/tier3/ Product Line support teams.

¨         Provided support to customers for O&M of RAN Network elements including competence transfer.

 

Samsung Telecommunications America, Sprint World Link         Minneapolis, MN

Field EngineerFeb 2013-Feb 2014
 

¨         Integrated and commissioned Samsung MMBS equipment to Samsung standards.

¨         Developed and maintain commissioning & integration documentation and provide necessary technical input on its development.

¨         Mentored and trained Samsung partners and other vendors/clients on the installation, commissioning and integration of MMBS equipment.

¨         Commissioned and integrated Cisco CSR and ASR routers to manufacturer's and Samsung specifications.

¨         Troubleshot all T-1, ATM backbone, microwave backhaul transmission methodology.

¨         Maintained RMA tracking and documentation for MMBS equipment.

¨         Reported to project manager with daily status of activities.

¨         Ran performance testing and analyze defects (Memory Leak, Stress Test & Power Consumption Measurement)

 

Artech, Nokia, T-Mobile Field Manager, Mobilization Project        Austin, TX Apr 2012-Jul 2012

 

¨         Conducted market meetings with client to finalize construction and Installment plans of quad port antenna and hybrid cable.   

¨         Supervised the staff ensuring quality of workmanship and timely completion of task.

¨         Monitored multiple site builds.  Proper installation of the Telec or Purcell SSC (Site Support Cabinet).

¨         Reviewed survey packages from field teams for acceptance.  Rejected survey packages with inefficient processes and made recommendations for improvement.

¨         Utilized IPM to retrieve sites information from field vendors (ex, Survey uploads).

¨         Educated counterpart Field Managers in areas of LMU / Axius relocation from Nortel into the SSC.

¨         Participated in daily meetings with market PM to update field progress and task completions.

¨         Supported regional PM to prepare / update roll-out schedule (IPM)

 

Telnet Inc., Cricket Wireless, Senior RF EME Auditor                    (Portland, OR)                          Feb 2011 – Nov 2011               

 

¨                                                                                                                                                                                                                                                                                                                                               RF EME Testing is performed to measure the RF radiation levels on rooftops to assure compliance with FCC standard on Maximum

¨                                                                                                                                                                                                                                                                                                                                               Permissible Exposure (MPE).

¨                                                                                                                                                                                                                                                                                                                                               Using the provided 8718 meter and 8722 probe measure and log the EME value at 5-10 feet distances throughout the rooftop.

¨                                                                                                                                                                                                                                                                                                                                               Identified and took pictures of all the carriers on the rooftop.  Identified and took pictures of any BTS equipment/shelter on the rooftop.

¨                                                                                                                                                                                                                                                                                                                                               Identified the model #, azimuths, and down tilt of Nextel antennas. 

¨                                                                                                                                                                                                                                                                                                                                                           Took pictures of all the RF signage on display on the roof accesses and on the rooftop.

¨                                                                                                                                                                                                                                                                                                                                                           Took note of any missing RF Signage. 

¨                                                                                                                                                                                                                                                                                                                                                           Measured the dimensions of the rooftop. 

¨                                                                                                                                                                                                                                                                                                                                                           Draw a sketch of the rooftop using graph paper and mark the points at which the EME values were measured.

¨                                                                                                                                                                                                                                                                                                                                                           Provided recommendations on whether the site passes EME testing or not based on the measured EME values

 

Ericsson 3G/4G Field Engineer (Atlanta, GA)

Tangent / Parsons / AT&T   May 2011 – Aug 2011

                                                                                                                      

¨         Installation and integration and call test of Ericsson 3G Node B, 2nd and 3rd carrier

¨         Integration and call test of Ericsson LTE node.

¨         Troubleshot network connectivity and Transport system failures IP/UNIX

 

Nokia RNC Engineer                                                          Irving, TX                                                             

Tangent / Lemcon / T-MobileMarch 2011 – April 2011

 

¨         Responsible for co-operating with the technical support of 3rd party equipment

¨         Function verification in accordance with the maintenance documentation of the network element

¨         Corrected RNC faults and performance degradations in the managed network

¨         Standard Engineering Support activities for network and service development

¨         ATM/IMA knowledge and implementing

¨         Updating connection configuration  (CoCo)

¨         Loading Scripts, Rehomes

 

RF Field Optimization EngineerColumbus, OH

Tangent / T-Mobile                                                                                                               Oct 2010 – Dec 2010

 

Planned and executed tasks to optimize RF clusters in the customer network during the Nokia deployment.

¨                                                                                                                                                                                                                                                                                                                                               Confirmed spectrum clearance, integration testing, power calibration, and call-through tests were carried out working closely in conjunction with Nokia BSC/RNC.

¨                                                                                                                                                                                                                                                                                                                                               Troubleshot areas with poor RF performance utilizing calibrated sweep gear.

¨                                                                                                                                                                                                                                                                                                                                               Familiarity with RF Optimization tools and test equipment, Antenna down tilts using RFS protocol adaptor.

¨                                                                                                                                                                                                                                                                                                                                               Ensured all optimization work meet agreed-upon Key Performance Indicator criteria by time line date scheduled with the customer.

 

RF Field Engineer Miami, FL

Civil Solutions Inc. / T-Mobile                                                                                                                              Nov 2009 – Feb 2010

 

¨         2G Ericsson (GSM) and 3G Nokia (UMTS) new site turn ups

¨         2G (GSM) and 3G (UMTS) T1 add and augments with switch head to head test

¨         Ericsson DTRU radio adds

¨         Experience using HOMER to retrieve trouble tickets and work order assignments

 

RF Equipment EngineerJacksonville, FL

Tek Systems Inc. / T –Mobile                                                                                                                               May 2009 - Nov 2009

 

¨         Performed Ericsson GSM 2106, 2106 V3, 2102 cabinet troubleshooting & upgrades

¨         Nokia UMTS FCOA with 2nd FSMD installation, troubleshooting commissioning & Integration

¨         LMU & GPS antenna installation, (E911) programming & troubleshooting (Procom Program)

¨         Anritsu RF sweep gear utilized on antenna equipment

¨         T-Mobile T1 compliant, installation, RJ 45-48 preparation, testing and integration

¨         Applied RFS manager program to adjust down tilt degree of antenna

 

RF Equipment EngineerDallas, TX

Tek Systems Inc. / T–Mobile, Dallas, Texas                                                                                                                Dec 2007 - Oct 2008

 

¨         Ericsson BTS Integrator/call tester; Alaska Digitel and GCI

¨         Ericsson 2106/2206 cabinets

¨         Monitored cabinet functions utilizing the Operation and Maintenance Terminal (OMT) and created/ installed IDB parameters 

¨         Installed Edge DTRU’s & CDU‘s along with all accompanying RF equipment

¨         Call tested each channel upon completion of integration

¨         Integration and utilization of Nokia test phones

¨         Troubleshooting of RBS cabinets, performing channel adds

¨         Delivered and installed AC electrical power from power meter to corresponding equipment

¨         Conducted drive testing/call testing and on air call testing that verified both hardware and software changes

¨         Used T-berd, 2 carrier adds

¨         Quality Coordinator for T-Mobile-Nokia (Flexi)

 

Lead Technician                                                                      Dallas, TX

BCI Communications, Dallas, Texas                                                                                                                Jan 2006 – Dec 2007               

¨        Applied Nextel/Sprint innovative 3-G configuration to existing cellular sites

¨        Successfully completed numerous 900 MHz upgrades within Nextel/Sprint wireless network

¨        Performed new site builds per client representative request

¨        Installed numerous ISC units to replace outdated technology

 

Engineer/Contractor Positions                                            Dallas, TX

Tek Systems Inc.                                                                                                                                                           Aug 2000 – Oct 2005               

¨        RBS GSM/UMTS/Equipment Engineer for Cingular Wireless

        GSM Installer for EXI Parsons/T-Mobile 

¨        Technician for Marconi Wireless/EXI Parsons

¨        RBS Engineer for Ericsson

 

Military Experience

 

Network Engineer/Administrative Specialist               Killeen, TX                                                       

Unites States Army, Killeen, Texas                                                                                                                              Dec 1995 – Dec 1999               

¨        Installed and maintained Digital Network Voice Terminal.

¨        Conducted equipment layouts and database configuration

¨        Supervised and performed duties utilizing Spitfire Satellite Communication System

 

EDUCATION

 

Coursework towards Bachelor of Science, Human Resource Development                                          

Clemson University, Clemson, SC

 

Associates of Science, Liberal Arts and Business Administration                                                                      

Nassau Community College, Garden City, NY 

 

 

Harom Pringle

4466 Laredo Drive ¨Grand Prairie, Texas 75052

 

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

Field Manager

Synergy wireless

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Manager (Manager/Supervisor of Staff)

Date of Availability:

Immediately

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Yes

Citizenship:

US citizen

 

 

Target Job:

Target Job Title:

Field Manager

Desired Status:

Full-Time

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-TX-Fort Worth

Relocate:

No

Willingness to travel:

Up to 50% travel